# GENNEIA WIND PROJECTS IN ARGENTINA: Wind Power in Argentina

> Markdown version of https://www.carbonfootprint.store/projects/genneia-wind-projects-in-argentina-673777384108c302d7d35fd0. Part of The Carbon Marketplace (carbonfootprint.store), run by Carbon Footprint Ltd. See https://www.carbonfootprint.store/llms.txt for how agents can use the site.

GENNEIA WIND PROJECTS IN ARGENTINA: Wind Power project in Argentina, Verified Carbon Standard. The Genneia Wind Projects in Argentina are six…

## Key facts

- Standard: Verified Carbon Standard
- Project identifier: VCS1987
- Country: Argentina
- Project activity: Wind Power
- Listed vintages: 2024
- CRISP rating: 3.6 out of 5
- Available to buy: Yes

Browse this project in the marketplace without an account at https://www.carbonfootprint.store/?project=673777384108c302d7d35fd0&tab=browse, or [sign in to see your price](https://www.carbonfootprint.store/login?project=673777384108c302d7d35fd0&tab=browse) and purchasing options. Availability and vintages are confirmed when ordering.

## About this carbon credit project

The Genneia Wind Projects in Argentina are six grid-connected wind farms with a combined installed capacity of 223.38 MW and 59 turbines (Vestas V126 and Nordex N149/N131). They are located in Chubut (Chubut Norte I and II, near Puerto Madryn), Rio Negro (Pomona I and II, near Choele Choel) and Buenos Aires province (Villalonga I and II, near Carmen de Patagones). The plants began operating between late 2018 and early 2021 and deliver metered electricity to the Argentine Interconnected System (SADI). The climate mechanism is displacement: the grid is still supplied partly by fossil-fuel plants, so each MWh of wind output displaces fossil generation. Credits are calculated as baseline grid emissions avoided using the ACM0002 combined margin factor of 0.4484 tCO2/MWh, which was set ex ante. The project has no project emissions and no leakage under the methodology. In 2024 the plants generated 873,806.52 MWh and avoided 391,812 tCO2e, as verified by VERIFIT SAS.

The main environmental benefit is the displacement of fossil-fuel generation and its associated air pollutants, which the project documents describe qualitatively. The sites are open, relatively flat Patagonian steppe. Environmental impact assessments for each farm were approved by provincial authorities between 2016 and 2018. The 2024 monitoring report identifies a potential interference of turbines with migratory bird routes. Periodic fauna mortality monitoring has found the rate to be marginal, so no specific mitigation has been implemented. No rare, threatened or endangered species or habitats were identified in the EIA or during operation. No ecosystem conversion or water use is reported.

Social contributions include 21 operation and maintenance jobs, which the 2024 monitoring report says were all retained with no new hires in 2024. Project documents also state a target of at least 70 percent local employment at Pomona. Genneia operates a grievance channel (mailbox, telephone, email, complaints book and periodic bulletins) that logged around 27 requests in 2024, covering donations, school and public visits and equipment. Some requests were granted, such as computers, tyres, air conditioners and training, while others were declined, such as a donation above USD 70,000 and a visit for 100 people. One complaint about firebreak maintenance was resolved. Stakeholder consultations were held in Chubut in 2013-2015, in Pomona in March 2018 and in Villalonga in 2017. No Indigenous peoples or customary rights holders are reported, and the 2019 public comment period received no comments.

## Project assessment and evidence

[Read the CRISP assessment for GENNEIA WIND PROJECTS IN ARGENTINA](https://carbonoffsetratings.org/projects/#carbon-offset-ratings/view-project-details2/673777384108c302d7d35fd0/)

## Listed Sustainable Development Goals

- SDG 7: Affordable and Clean Energy
- SDG 8: Decent Work and Economic Growth
- SDG 13: Climate Action

## Categories

- [Verra VCS carbon credits](https://www.carbonfootprint.store/carbon-credits/verra-vcs.md)

## Compare related projects

- [Grid Connected Wind Power Project In Maharashtra India By Bhilwara](https://www.carbonfootprint.store/projects/grid-connected-wind-power-project-in-maharashtra-india-by-bhilwara-674751ac03198f02d2252496.md): Wind Power in India. Gold Standard; vintages 2022; CRISP 3.6/5.
- [Larimar Wind Farm Project](https://www.carbonfootprint.store/projects/larimar-wind-farm-project-60ee0af84047cb0752222b7d.md): Wind Power in Dominican Republic. Verified Carbon Standard; vintages 2023; CRISP 3.6/5.
- [Loi Hai 2 Wind Farm Project – 28.8 MW](https://www.carbonfootprint.store/projects/loi-hai-2-wind-farm-project-28-8-mw-689b03a5a402ef02f91cacbb.md): Wind Power in Viet Nam. Gold Standard; vintages 2022; CRISP 3.6/5.

---

Choose a project with confidence: compare the project activity, standard, available vintages and CRISP assessment. Create a free account to view prices and buy individual projects. For orders over 500 tCO2e, contact info@carbonfootprint.com or +44 (0)1256 592599 to discuss your requirements. Start with measuring and reducing your emissions; supporting carbon projects can form part of your wider climate action plan.

- [Carbon credit buying FAQ](https://www.carbonfootprint.store/faq)
- [Carbon Footprint services](https://www.carbonfootprint.com)
- [Measure business emissions with Sustrax](https://www.sustrax.com)
- [Guide for AI agents](https://www.carbonfootprint.store/llms.txt)

Contact: info@carbonfootprint.com · +44 (0)1256 592599 · Carbon Footprint Ltd, Basingstoke, UK.
