Wind power project in Maharashtra, India - Andhra Lake Phase - II

Verified Carbon Standard

Wind power project in Maharashtra, India - Andhra Lake Phase - II

Carbon credits from Wind Power in India.

Standard
Verified Carbon Standard
Project identifier
VCS1481
Country
India
Project activity
Wind Power
Listed vintages
2024

Browse this project in the marketplace without an account, or sign in to see your price and purchasing options. Availability and vintages are confirmed when ordering.

About this carbon credit project

The Andhra Lake Phase II project is a 50.4 MW wind power plant in the Khed and Maval taluks of Pune district, Maharashtra. It uses 63 Wind World (formerly Enercon) E-53 turbines of 0.8 MW each, commissioned between late 2011 and late 2012. The net output is sold to the state distribution utility (MSEDCL) under power purchase agreements and fed into the integrated Indian grid. The climate mechanism is displacement: each MWh of wind output is credited against the combined margin grid emission factor of 0.9310 tCO2e/MWh (CEA CO2 Baseline Database v18, fixed ex ante under ACM0002), which represents the largely fossil-fuelled generation that would otherwise have supplied the grid. The project is registered under VCS (ID 1481) and is in its second crediting period, 19/08/2021 to 18/08/2031, following an earlier CDM registration. The documents describe the environmental benefit mainly as avoided CO2 from fossil generation, together with avoided SOx, NOx and particulate emissions from displaced thermal plants and reduced water use by thermal generation. The 2010 environmental impact assessment and the project's own risk tables identify no significant impacts on biodiversity, soils, water or threatened species. The project involves no land conversion, planting or species introduction, so the documents claim no direct biodiversity gains. Documented social benefits include local employment during construction and operation, at least one staff training per year, road improvements reported by stakeholders at the 19/02/2010 consultation, and community engagement through site asset managers and an on-site grievance register. No grievances or public comments were recorded in the 2024 monitoring period. Stakeholder consultation records date from 2010, and the documents do not quantify jobs or community investment.

Project assessment and evidence

CRISP project rating: 3.6 / 5

Review the CRISP assessment for this project and the evidence behind its rating before deciding. A project assessment is different from a customer review or a guarantee of future performance.

Read the CRISP assessment for Wind power project in Maharashtra, India - Andhra Lake Phase - II

Listed Sustainable Development Goals

  • 7. Affordable and Clean Energy
  • 8. Decent Work and Economic Growth
  • 13. Climate Action

Compare related projects

Choose a project with confidence

Compare the project activity, standard, available vintages and CRISP assessment. Sign in to see the price and purchasing options available to your account.

Start with measuring and reducing your emissions. Supporting carbon projects can form part of your wider climate action plan.