About this carbon credit project
The Genneia Wind Projects in Argentina are six grid-connected wind farms with a combined installed capacity of 223.38 MW and 59 turbines (Vestas V126 and Nordex N149/N131). They are located in Chubut (Chubut Norte I and II, near Puerto Madryn), Rio Negro (Pomona I and II, near Choele Choel) and Buenos Aires province (Villalonga I and II, near Carmen de Patagones). The plants began operating between late 2018 and early 2021 and deliver metered electricity to the Argentine Interconnected System (SADI). The climate mechanism is displacement: the grid is still supplied partly by fossil-fuel plants, so each MWh of wind output displaces fossil generation. Credits are calculated as baseline grid emissions avoided using the ACM0002 combined margin factor of 0.4484 tCO2/MWh, which was set ex ante. The project has no project emissions and no leakage under the methodology. In 2024 the plants generated 873,806.52 MWh and avoided 391,812 tCO2e, as verified by VERIFIT SAS.
The main environmental benefit is the displacement of fossil-fuel generation and its associated air pollutants, which the project documents describe qualitatively. The sites are open, relatively flat Patagonian steppe. Environmental impact assessments for each farm were approved by provincial authorities between 2016 and 2018. The 2024 monitoring report identifies a potential interference of turbines with migratory bird routes. Periodic fauna mortality monitoring has found the rate to be marginal, so no specific mitigation has been implemented. No rare, threatened or endangered species or habitats were identified in the EIA or during operation. No ecosystem conversion or water use is reported.
Social contributions include 21 operation and maintenance jobs, which the 2024 monitoring report says were all retained with no new hires in 2024. Project documents also state a target of at least 70 percent local employment at Pomona. Genneia operates a grievance channel (mailbox, telephone, email, complaints book and periodic bulletins) that logged around 27 requests in 2024, covering donations, school and public visits and equipment. Some requests were granted, such as computers, tyres, air conditioners and training, while others were declined, such as a donation above USD 70,000 and a visit for 100 people. One complaint about firebreak maintenance was resolved. Stakeholder consultations were held in Chubut in 2013-2015, in Pomona in March 2018 and in Villalonga in 2017. No Indigenous peoples or customary rights holders are reported, and the 2019 public comment period received no comments.